Opening a New Business? Your Signage Checklist
Opening a new business? Your signage checklist, week by week
Facts confirmed by Zulfeqar Ahmed, CEO, Vivid Ads · Printing in Melbourne since 2007 · Updated 24 Nov 2026
You have the name, the lease and the opening date. This checklist covers the signs that turn those into customers: what to check before you print, what a shopfront needs, what to buy first on a small budget, and a week-by-week timeline you can print.
✓ Product facts checked on our live website 24 Nov 2026. Rules and research link to official sources, listed with the date we checked them.
Examples shown are Vivid Ads product images (not customer installations at a specific business). Tap one to see sizes and options.

What to print first (by business type)
| Business | First three signs | Then |
|---|---|---|
| Shop on a street | Window headline · hours on the door · footpath A-frame (permit) | Flags, opening banner, counter signs |
| Café or restaurant | Window headline · menu with total prices · A-frame (permit) | Barriers (dining permit), flags, specials boards |
| Salon or studio | Frontage sign · hours and booking · price list | Brand wall, selfie spot, footpath board |
| Clinic or health practice | Practice sign · hours and after-hours info · reception and room signs | Factual signs only: see Ahpra advertising guidance |
| Upstairs, rear or industrial unit | Street-level pointer · entrance sign · flags at the driveway | Reception wall, wayfinding |
| Home-based or mobile | Market or pop-up kit · small sign where permitted | Pull-up, table cover, flags |
| Online seller | Pop-up and market kit | Media wall for photos, packaging inserts |
More detail for each: retail, hospitality, fitness, beauty & wellness, home business.
New shopfront signage checklist
- Name readable from across the street
- What you do, in three or four words
- Street number visible
- Hours, phone and web address on the door
- Lower window clear enough to see in
- One footpath board facing both directions (permit)
- Accessible entrance marked if it isn't the main door
- Same colours and font on every sign
- QR codes tested at printed size
- Nothing blocks the footpath clear path
For windows, A-frames and sale signs in detail, see our retail and shopfront guide.
Rules to check before you print
- Landlord or centre: most leases control frontage and window signs. Get the signage criteria in writing.
- Planning: permanent business signs can need a planning permit depending on zone, size and overlays. In Victoria, start with your zone (VicPlan property report) and our clause 52.05 explainer.
- Footpath: A-frames, flags and outdoor dining on public land usually need a council permit. See our footpath permits guide; other states: rules by state or ABLIS.
- Claims: opening offers must be accurate, with clear terms (ACCC).
Week-by-week timeline
Printable checklist
Tick items as you go; your ticks stay in this browser only.
Design it with AI: A$9.95 per design
Type what you want on the sign, pick a product and size, and our AI design tool lays out the artwork for you. It saves you time, money and hassle: get your designs ready in minutes. You pay A$9.95 per design (only the design you finalise is added to your cart, paid at checkout), and digital proof included on every printed order.
Signs new businesses order first

A Frame Signs
Two printed 600 × 900 mm boards.

Feather Flags
Opening-week height and movement.

Aluminium Panel Signs
4 mm aluminium composite panel, up to 1200 × 900 mm.

Corflute Signs
Lightweight 5 mm boards for windows and temporary signs.
See the live price, sizes and options on each product page. Digital proof included on every printed order: you approve it before we print; design is a paid option, or use Design it with AI at A$9.95 per design. Frames, poles, bases and other hardware carry a 12-month hardware warranty, in addition to your Australian Consumer Law rights. Delivery Australia-wide (freight calculated at checkout) or free pickup from Gate 2, 90 Australis Drive, Derrimut VIC. Photos are Vivid Ads product images.
How ordering works
- Upload your artwork, or choose a paid design option on the product page. Design it with AI is A$9.95 per design.
- Approve your digital proof. Digital proof included on every printed order. Production starts once every proof is approved and payment has cleared (or approved account terms are in place); pay by card at checkout or by invoice.
- Production: 1–15 items are made in 1 working day once the proof is approved and payment has cleared (or approved account terms are in place) by 3 pm Melbourne time on a working day; 16–40 take 2 working days, 41–100 take 3 and 101–200 take 4; above 200, our production team confirms the time after proof approval. Some products have a longer minimum production time, shown on the product page. We don't offer same-day production or paid express freight.
- Delivery or pickup: freight is calculated at checkout for your postcode and transit time depends on where you are, or collect free from Gate 2, 90 Australis Drive, Derrimut VIC, 9 am–5 pm on working days once we email that your order is ready. Christmas 2026: we are closed from Thursday 24 December 2026 and reopen Tuesday 5 January 2027; for events in that period, arrange delivery or pickup before 24 December and call 1300 721 614 to confirm cut-offs.
Questions people ask
What signs does a new business need?
At minimum: a sign people can read from the street, hours and contact details on the door, and a way to say what you do. A footpath board and opening flags help in the first weeks.
How long before opening should I order signs?
Production is quick (1 working day for 1–15 items once the proof is approved and payment has cleared, or approved account terms are in place, by 3 pm Melbourne time; some products take longer), but leave several weeks for landlord approval, permits and design decisions.
Do I need a permit for my shop sign?
It depends on your zone, the sign's size and type, and any overlays. In Victoria, see our clause 52.05 guide; otherwise check with your council.
I need a name for my business. Can you help?
We don't choose names, but once you have one, Design it with AI turns it into sign artwork for A$9.95 per design.
Can you do window stickers or decals?
Not at the moment: stickers and decals are paused. For windows, ask our team about printed boards behind the glass. Apply for permits early (approval times vary) and put opening flags and footpath boards only in approved spots.
Should I check my business name before printing?
Yes. Check business name availability with ASIC and existing trade marks with IP Australia before you finalise signage artwork.
Sources
| Fact | Source | Checked |
|---|---|---|
| Victoria: sign categories by zone, exempt signs and when a permit is needed | Victoria Planning Provisions: Clause 52.05 Signs | 20 Nov 2026 |
| Free planning property report showing your zone and overlays | VicPlan | 20 Nov 2026 |
| Victorian business sign rules explained | Vivid Ads: Business sign permits in Victoria | 20 Nov 2026 |
| Model footpath trading conditions for Victorian councils (A-frames, flags) | Victorian Government: Guide to Footpath Trading Permits (PDF) | 24 Nov 2026 |
| Find the permits your council needs | ABLIS (Australian Business Licence and Information Service) | 24 Nov 2026 |
| Claims on signs must not be false or misleading | ACCC: False or misleading claims | 24 Nov 2026 |
| Product sizes, options and production times | Vivid Ads product pages and Help Centre | 24 Nov 2026 |
What our customers say
“For a small business with a limited budget, the outcome exceeded my expectations.”
“especially A frame print quality is super good.”
“our print looks fantastic and has already helped promote our business.”
Selected 5-star excerpts from verified Vivid Ads store reviews (all products, not only this topic), quoted word for word, including any typos. Read all our customer reviews.



